Guesthouses
Furniture for guesthouses, made in Foshan.
For boutique guesthouses of 10–30 rooms, furnished the same way. Repeat pieces suit Foshan factories well. We find the factories, check the samples, and have every batch inspected before it ships.
- rooms
- 10–30
- spec for every room
- 1
- weeks, roughly
- 12–18
Who this is for.
- Boutique guesthouses and small hotels, usually 10–30 rooms furnished the same way.
- Standard loose furniture: beds, bedside tables, chairs and tables, from a list or room schedule you already have.
- Going to the US, Canada, the UK, Europe, Australia or New Zealand.
One room, made twelve times.
Repeat pieces suit factories well. You approve one spec and one set of samples, then the factory makes the same piece for every room. That usually means steadier quality and a better price per piece than single, custom pieces.
One spec · one set of samples · one inspection per batch
How we help.
The same buyer-side process as every project, set up for many rooms at once.
- [PHOTO: a room schedule, marked up]
One spec for every room
We turn your room schedule into one clear spec per piece, with the units for every room.
- [PHOTO: a bedside table sample]
Samples once
You approve a sample, or photos of it, before you pay any factory deposit. Every room is made to that sample.
- [PHOTO: an inspector checking a batch]
Every batch inspected
An independent inspection company checks the furniture against your approved spec before it is packed.
- [PHOTO: room sets packed into one container]
One shipment
We combine pieces from different factories into one shipment, planned around your opening.
What is not included, and commercial rules.
Not something we do
- Fitted kitchens and built-in cabinetry
- Measuring or installation
- Interior design or room layouts
Commercial rules
Furniture for guest rooms can face different fire-safety and durability rules from furniture for a home. Your fit-out consultant or local rules decide what’s needed.
Tell us which rules apply, and we ask each factory for test evidence before any deposit.
How we keep your order safe.
How it works, step by stepSamples before deposits
You approve a sample, or photos of it, before you pay any factory deposit.
Inspection before balances
You pay each factory’s 70% only after its inspection passes and you approve shipping.
Checked bank details
Checked by phone and in writing before you pay, and never changed by message.
No commission, no margin
You pay factories their quoted price, directly. Factories pay us nothing.
Planning around your opening.
Usually 12–18 weeks in total, and some steps overlap. Allow 4–8 weeks more if your project runs through Chinese New Year. Tell us your opening date and we’ll work back from it.
- About 1–2 weeksQuotes
- As long as you needYou choose
- About 2–4 weeksSamples
- About 4–7 weeksMaking
- About 1 weekInspection
- About 2–7 weeks at seaYour opening
An example guesthouse.
Illustrative example, not a real project. The pieces and units show how a room set is planned.
Seabreeze Guesthouse
Stage: quotes12 rooms · Margaret River, Australia
- Queen bed frameUnits: × 12One per room
- Bedside tableUnits: × 24Two per room
- ArmchairUnits: × 12Fabric to suit commercial rules
- Pendant lightUnits: × 12[finish]
Duty into Australia: 0% with a ChAFTA certificate of origin, 5% without, plus 10% GST.
What it costs.
Quotes are free. If you go ahead: 6% of the furniture, or US$3,000 if that’s more.
Half when you confirm your order, half before shipping. Furniture, samples, inspection, shipping, duty and taxes you pay directly, at cost.
See all costsSend what you have.
A room schedule, a mood board or a rough list is enough to start, with your room count, opening date and where it’s going.